Kitchen Design Cost Estimator
Plan your dream kitchen with our detailed cost estimator. Get an accurate breakdown of expenses for your renovation project.
1 Kitchen Size & Layout
Kitchen Size
Small (Under 100 sq ft)
$8,000 - $12,000
Medium (100-200 sq ft)
$15,000 - $25,000
Large (Over 200 sq ft)
$25,000 - $40,000
Layout Type
Galley
+ $2,000
L-Shaped
+ $3,500
U-Shaped
+ $5,000
Island
+ $6,000
2 Materials & Finishes
Cabinet Quality
Stock
+ $3,000
Semi-Custom
+ $7,000
Custom
+ $12,000
Countertop Material
Laminate
+ $2,000
Quartz
+ $4,000
Granite
+ $6,000
Marble
+ $8,000
3 Appliances & Features
Appliance Package
Basic
+ $4,000
Mid-Range
+ $8,000
High-End
+ $15,000
Additional Features
Smart Faucet
+ $1,500
Under Cabinet Lighting
+ $3,000
Ventilation System
+ $2,500
No Additional Features
+ $0
Estimated Total Cost
$18,500
| Category | Amount |
|---|---|
| Kitchen Size & Layout | $10,000 |
| Cabinets | $3,000 |
| Countertop | $2,000 |
| Appliances | $4,000 |
| Additional Features | $0 |
Apply 10% Professional Discount
-$1,850
Frequently Asked Questions
What is the average cost of a kitchen remodel?
The average kitchen remodel cost ranges from $15,000 to $40,000. Small kitchens (under 100 sq ft) typically cost $8,000-$12,000, medium kitchens $15,000-$25,000, and large kitchens $25,000-$40,000+. Our estimator helps you get a personalized budget based on your specific choices.
How accurate is this kitchen cost estimator?
Our estimator provides a reliable budget range based on current market prices for materials and labor. We update pricing quarterly. For a precise quote, consult with a professional contractor who can assess your specific space and requirements.
What is the most expensive part of a kitchen renovation?
Cabinetry (35-40%) and countertops (15-20%) are usually the largest expenses, often accounting for 50-60% of the total budget. Custom cabinets and natural stone countertops significantly increase costs compared to stock options and laminate.
How long does a kitchen renovation typically take?
Minor remodels: 3-6 weeks. Major renovations with layout changes: 8-12 weeks. Full gut renovations: 12-20 weeks. Timeline depends on project complexity, material availability, and contractor scheduling.
Should I include contingency in my kitchen budget?
Yes! Always include 10-20% contingency for unexpected expenses. Common surprises include electrical upgrades, plumbing issues, structural changes, or discovering problems behind walls during demolition.
Explore More Resources:
Tip: Bookmark this page to save your estimate or share it with your contractor.



